|
   
   
   
   
 
RIG LIST
As of January 10, 2012 these are the rigs active in Northeastern BC.
- There are 57 rigs drilling.
- There are 15 rigs released.
- Prep to Spud 7 rigs
- Prepare to Resume
1 rig.
|
Company |
Address |
Fax # |
Phone # |
# of Rigs |
|
Akita Drilling Ltd |
2302 8th
Street, Nisku AB T9E 7Z2 |
780-955-6726 |
780-955-6700 |
4 |
|
Beaver Drilling Ltd |
2003 76th
Avenue,
Edmonton AB T6P 1P6 |
780-436-3630 |
780-436-6950 |
|
|
Chinook Drilling |
2550 300-5 Avenue SW,
Calgary AB T2P 3C4 |
403-263-4015 |
403-269-2612 |
1 |
|
Ensign
Energy Services Inc |
2000 5th
Street, Nisku AB T9E 7X3 |
780-955-7208 |
780-955-8808 |
6 |
|
Horizon
Drilling Inc |
7803-39th
Street, Leduc AB T9E 3B0 |
|
780-986-7450 |
|
|
Jomax Drilling
(1998) Ltd |
9411 37th
Avenue,
Edmonton AB T6E 5N4 |
780-462-4742 |
780-462-4740 |
3 |
|
Nabors Drilling Ltd |
Box 1006,
902 20th Avenue,
Nisku AB T9E 7Z6 |
780-955-5227 |
|
8 |
|
Pantera Drilling |
1103 7 Street,
Nisku AB T9E 1R1 |
780-979-0237 |
780-979-0232 |
|
|
Patterson-UTI
Drilling Co Canada |
1306 8th
Street, Nisku AB T9E 7M1 |
780-955-7773 |
780-955-7777 |
3 |
|
Precision Drilling Co |
1513 8th
Street, Nisku AB T9E 7S7 |
780-955-7067 |
780-955-7922 |
7 |
|
Stoneham Drilling |
7509 42 Street
Leduc, AB T9O 0L2 |
780-986-2017 |
780-986-9789 |
3 |
|
Savanna Energy Services Corp |
1800 311 6
Avenue SW
Calgary, AB T2P 3H2 |
403-503-0654 |
403-503-9990 |
|
|
Trinidad Drilling Ltd |
3059 - 4th
Street, Nisku AB T9E 8L1 |
780-955-7527 |
780-955-2340 |
6 |
Oil & Gas Commission
In January 2011, there were 052 rigs drilling, 09 rigs released and
06 rigs prepped to spud.
In January 2010, there were 048 rigs drilling, 10 rigs released and 08
rigs prepped to spud.
In January 2009, there were 098 rigs drilling, 34 rigs released and 11
rigs prepped to spud.
In January 2008, there were 079 rigs drilling, 42 rigs released and 16
rigs prepped to spud.
In January 2007, there were 082 rigs drilling, 35 rigs released and 19
rigs prepped to spud.
In January 2006, there were 120 rigs drilling, 66 rigs released and 23
rigs prepped to spud.
In January 2005, there were 125 rigs drilling, 75 rigs released and 24
rigs prepped to spud.
In January 2004, there were 134 rigs drilling, 61 rigs released and 23
rigs prepped to spud.
In January 2003, there were 116 rigs drilling, 42 rigs released and 26
rigs prepped to spud.
In January 2002, there were 096 rigs drilling, 37 rigs released and 13
rigs prepped to spud. |