RIG LIST

As of August 31, 2010 these are the rigs active in Northeastern BC.

  • There are 41 rigs drilling.
  • There are 13 rigs released.
  • Prep to Spud 05 rigs.
  • Prepare to Resume 02 rig.
Company Address Fax # Phone # # of Rigs
Akita Drilling Ltd 2302 8th Street, Nisku AB T9E 7Z2 780-955-6726 780-955-6700 3
Beaver Drilling Ltd 2003 76th Avenue,
Edmonton AB T6P 1P6
780-436-3630 780-436-6950 2
Chinook Drilling 2550 300-5 Avenue SW,
Calgary AB T2P 3C4
403-263-4015 403-269-2612 1
Ensign Energy Services Inc 2000 5th Street, Nisku AB T9E 7X3 780-955-7208 780-955-8808 7
Horizon Drilling Inc 7803-39th Street, Leduc AB T9E 3B0   780-986-7450 1
Impact Drilling Ltd 1900 717 7th Street SW
Calgary, AB T2P 0Z3
403-262-4307 403-263-0751 0
Jomax Drilling (1998) Ltd 9411 37th Avenue,
Edmonton AB T6E 5N4
780-462-4742 780-462-4740 2
Nabors Drilling Ltd Box 1006, 902 20th Avenue,
Nisku AB T9E 8A8
780-955-2188 780-955-2381 7
Pantera Drilling 1103 7 Street, Nisku AB T9E 1R1 780-979-0237 780-979-0232  
Patterson-UTI Drilling Co Canada 1306 8th Street, Nisku AB  T9E 7M1 780-955-7773 780-955-7777 1
Precision Drilling Co 1513 8th Street, Nisku AB T9E 7S7 780-955-7067 780-955-7922 7
Quintera Drilling Ltd PO Box 1408, Brooks, AB  T1R 1C3 403-501-3705 403-501-3704  
Stoneham Drilling 7509 42 Street
Leduc, AB T9O 0L2
780-986-2017 780-986-9789 4
Savanna Energy Services Corp 1800 311 6 Avenue SW
Calgary, AB T2P 3H2
403-503-0654 403-503-9990 1
Trinidad Drilling Ltd 3059 - 4th Street, Nisku AB T9E 8L1 780-955-7527 780-955-2340 11

Oil & Gas Commission

In August 2009, there were 24 rigs drilling, 08 rigs released and 13 rigs prepped to spud
In August 2008, there were 62 rigs drilling, 19 rigs released and 11 rigs prepped to spud.
In August 2007, there were 36 rigs drilling, 14 rigs released and 14 rigs prepped to spud.
In August 2006, there were 62 rigs drilling, 17 rigs released and 10 rigs prepped to spud.
In August 2005, there were 47 rigs drilling, 25 rigs released and 18 rigs prepped to spud.
In August 2004, there were 37 rigs drilling, 16 rigs released and 12 rigs prepped to spud.
In August 2003, there were 39 rigs drilling, 13 rigs released and 10 rigs prepped to spud.
In August 2002, there were 18 rigs drilling, 05 rigs released and 13 rigs prepped to spud.