RIG LIST
As of August 31, 2010 these are the rigs active in Northeastern BC.
- There are 41 rigs drilling.
- There are 13 rigs released.
- Prep to Spud 05 rigs.
- Prepare to Resume
02 rig.
|
Company |
Address |
Fax # |
Phone # |
# of Rigs |
|
Akita Drilling Ltd |
2302 8th
Street, Nisku AB T9E 7Z2 |
780-955-6726 |
780-955-6700 |
3 |
|
Beaver Drilling Ltd |
2003 76th
Avenue,
Edmonton AB T6P 1P6 |
780-436-3630 |
780-436-6950 |
2 |
|
Chinook Drilling |
2550 300-5 Avenue SW,
Calgary AB T2P 3C4 |
403-263-4015 |
403-269-2612 |
1 |
|
Ensign
Energy Services Inc |
2000 5th
Street, Nisku AB T9E 7X3 |
780-955-7208 |
780-955-8808 |
7 |
|
Horizon
Drilling Inc |
7803-39th
Street, Leduc AB T9E 3B0 |
|
780-986-7450 |
1 |
|
Impact Drilling Ltd |
1900 717 7th
Street SW
Calgary, AB T2P 0Z3 |
403-262-4307 |
403-263-0751 |
0 |
|
Jomax Drilling
(1998) Ltd |
9411 37th
Avenue,
Edmonton AB T6E 5N4 |
780-462-4742 |
780-462-4740 |
2 |
|
Nabors Drilling Ltd |
Box 1006,
902 20th Avenue,
Nisku AB T9E 8A8 |
780-955-2188 |
780-955-2381 |
7 |
|
Pantera Drilling |
1103 7 Street,
Nisku AB T9E 1R1 |
780-979-0237 |
780-979-0232 |
|
|
Patterson-UTI
Drilling Co Canada |
1306 8th
Street, Nisku AB T9E 7M1 |
780-955-7773 |
780-955-7777 |
1 |
|
Precision Drilling Co |
1513 8th
Street, Nisku AB T9E 7S7 |
780-955-7067 |
780-955-7922 |
7 |
|
Quintera
Drilling Ltd |
PO Box 1408,
Brooks, AB T1R 1C3 |
403-501-3705 |
403-501-3704 |
|
|
Stoneham Drilling |
7509 42 Street
Leduc, AB T9O 0L2 |
780-986-2017 |
780-986-9789 |
4 |
|
Savanna Energy Services Corp |
1800 311 6
Avenue SW
Calgary, AB T2P 3H2 |
403-503-0654 |
403-503-9990 |
1 |
|
Trinidad Drilling Ltd |
3059 - 4th
Street, Nisku AB T9E 8L1 |
780-955-7527 |
780-955-2340 |
11 |
Oil & Gas Commission
In August 2009, there were
24
rigs drilling, 08 rigs released and 13 rigs prepped to spud
In August 2008, there were 62 rigs drilling, 19 rigs released and 11
rigs prepped to spud.
In August 2007, there were 36 rigs drilling, 14 rigs released and 14
rigs prepped to spud.
In August 2006, there were 62 rigs drilling, 17 rigs released and 10
rigs prepped to spud.
In August 2005, there were 47 rigs drilling, 25 rigs released and 18
rigs prepped to spud.
In August 2004, there were 37 rigs drilling, 16 rigs released and 12
rigs prepped to spud.
In August 2003, there were 39 rigs drilling, 13 rigs released and 10
rigs prepped to spud.
In August 2002, there were 18 rigs drilling, 05 rigs released and 13
rigs prepped to spud. |